The solar/diesel/battery power system installed is designed to provide 24-hour power system. System installation included 2 x SMA Tripower STP25000TL coupled with the SMA Sunny Island three phase multi-cluster inverter system.
The DC inverter automatically recharges the cluster battery bank. The generator is interfaced with the inverter system which starts the generator when required to recharge the battery bank.
The power system design loading is 870 kWh per day on average. This system was installed by Clay Energy as an EPC project for the Department of Energy.
SOLAR PANELS - 136 x 375W JA Solar panels
INVERTERS - 2 x SMA STP25000TL-30
BATTERY INVERTER - 9 x SMA Sunny Island SI8.0H
BATTERY - 15 x BYD B-Box Pro @ 13.8kWh
SOLAR PANEL MOUNTING - Clenergy Ground Mount Structure
INVERTER MOUNTING - Indoor