Clay Energy
Clay Energy
  • About Us
  • Our Experience
  • Our Products & Service
  • Contact Us
  • More
    • About Us
    • Our Experience
    • Our Products & Service
    • Contact Us
  • Sign In
  • Create Account

  • Bookings
  • My Account
  • Signed in as:

  • filler@godaddy.com


  • Bookings
  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • About Us
  • Our Experience
  • Our Products & Service
  • Contact Us

Account


  • Bookings
  • My Account
  • Sign out


  • Sign In
  • Bookings
  • My Account

514kWp PV GRID CONNECT SYSTEM

2024

The 514kWp PV grid-connected system at the Crest Chicken Processing Plant is designed and installed by Clay Energy as an EPC project to assist Goodman Fielder International (Fiji) in achieving 100% renewable electricity by 2025. Goodman Fielder International focuses on delivering energy efficient and productive improvements within their manufacturing sites, depots, warehouses and freight centres across Australia, New Zealand, Fiji, New Caledonia, and PNG.


System installation consists of a combination of Trina Solar and JA Solar PV modules and Sungrow PV inverters of various models. The installed system feeds directly into the plant’s distribution boards across the site resulting in a massive reduction in the plant’s daytime power consumption from the utility grid.


SYSTEM CONFIGURATION

SOLAR PANELS - 960 x 425W Trina Solar & 274 x 390W JA Solar panels

INVERTERS - 1 x SG110CX, 4 x SG50CX, 4 x SG30CX, 1 x SG20RT & 2 x SG8.0RT Sungrow inverters

SOLAR PANEL MOUNTING - Clenergy PV-ezRack Roof Mount System

INVERTER MOUNTING - Indoor & Outdoor

PV ENERGY YIELD - 659MWh per annum


159kWp PV GRID CONNECT SYSTEM

2022

The 159.08kWp PV Grid-connected system was designed and installed by Sunergise’s EPC partner Clay Energy Limited for Goodman Fielder International’s (Fiji) Waila farm in Nausori. 


It enables Goodman Fielder International (Fiji) to save on electricity costs and further reduce its carbon footprint. It is sized to supply the day usage of the Goodman Fielder International’s (Fiji) chicken farm sheds. A total of 140kW of inverters have been used to supply 3 phase power to the farm.


SYSTEM CONFIGURATION

SOLAR PANELS - 388 x 410W JA Solar panels

INVERTERS - 1 x SG110CX & 1 x SG30CX Sungrow inverters

SOLAR PANEL MOUNTING - Clenergy PV-ezRack Roof Mount System

INVERTER MOUNTING - Outdoor

PV ENERGY YIELD - 203MWh per annum


320kWp PV GRID CONNECT SYSTEM

2018

The 319.5kWp PV grid connect system was designed and installed by Sunergise’s EPC partner Clay Energy as the Pacific Island’s largest sustainably powered cold storage facility at the time of its installation. It enables Goodman Fielder International (Fiji) to save on electricity costs and further reduce its carbon footprint.


It is sized to supply the day usage of the Goodman Fielder Office and Production Plant. A total of 280kW of inverters have been used to supply 3 phase power to the building. The installed system will have a positive environmental impact equivalent to planting over 8000 trees.


SYSTEM CONFIGURATION

SOLAR PANELS - 1,065 x Trina Solar 300W solar panels

INVERTERS - 14 x SMA Sunny Tripower STP25000TL-30 inverters

SOLAR PANEL MOUNTING - Clenergy PV-ezRack Roof Mount System

INVERTER MOUNTING - Indoor

PV ENERGY YIELD - 410MWh per annum


Back to archives

Copyright © 2018 Clay Energy


  

Powered by

  • About Us

Cookie Policy

This website uses cookies. By continuing to use this site, you accept our use of cookies.

Accept & Close